Yi Ann Electrical Engineering added new photo in Sub Meter Installation 子仪表安装 - EMH sub meter with sirim
Jan 5, 2019 at 11:33 am —
Install EMH Sub meter with sirim

Install EMH Sub meter with sirim

Sub meter with sirim installed at UOA business park - Glenmarie Shah Alam read more
Yi Ann Electrical Engineering added 8 new photos in Mutiara Damansara(#install new power point & heater point)
Jan 4, 2019 at 07:36 pm —
Yi Ann Electrical Engineering updated Review page content
Jan 4, 2019 at 03:59 pm —

Review

   read more
Yi Ann Electrical Engineering updated NEWPAGES Profile
Dec 12, 2018 at 06:15 pm —
Yi Ann Electrical Engineering updated NEWPAGES Profile
Dec 12, 2018 at 06:14 pm —
Yi Ann Electrical Engineering added 2 new photos in Troubleshoot & Repair 排查和维修
Nov 27, 2018 at 02:10 pm —
Repair Burnt out TNB cable and  cut-off fuse
Tripping on fuse box
Yi Ann Electrical Engineering added new photo in Sub Meter Installation 子仪表安装
Nov 27, 2018 at 02:10 pm —
Analog sub meter installation

Analog sub meter installation

Analog sub meter installed to monitor the air cond usage for each room in the house  read more
next page